Chapter 1 OVERVIEW OF HAl RIVER BASIN AND BOHAI SEA
1.1 BOHAI SEA - The Context
1.1.1 Physical and Biological Environment of Bohai Sea and Bohai Bay
1,1.2 Exploitation of Natural Resources of Bohai Sea
1.1.3 Environmental Pressures On Bohai Sea and Bohai Bay
1.2 HAI RIVER BASIN
1.2.1 Socio-economic Profile
1.2.2 Environment
1.2.3 Evapotranspiration ET
1.2.4 Social and Economic Situation in Hai River Basin
1.3 INSTITUTIONAL SITUATION AND LEGAL FRAMEWORK
1.3.1 The Basin Management System
1.3.2 Analysis of the Problems of the Present Management System
1.4 PLANNING SYSTEM IN HAI RIVER BASIN
1.4.1 Plan Types
1.4.2 Planning Procedures
Chapter 2 PROJECT CONTENT AND TECHNOLOGY ROADMAP
2.1 THE GEF HAI RIVER PROJECT
2.2 PROJECT OBJECTIVES
2.2.1 Geographical Scope
2.2.2 Project Goals
2.2.3 Specific Objectives
2.3 OVERALL PROJECT TECHNICAL FRAMEWORK
2.4 MANAGEMENT OF THE PROJECT
2.5 TECHNICAL QUALITY
2.6 PEFORMANCE MANAGEMENT
2.6.1 Project Monitoring and Evaluation Management System
2.6.2 Indicator System for Project Monitoring and Evaluation
2.7 CAPACITY BUILDING
2.7.1 Top-Down, Bottom-Up and Horizontal Management Principles
2.7.2 Training
2.7.3 Baseline Survey
Chapter 3 CONCEPTUAL INNOVATIONS AND THREE TECHNOLOGIES
3.1 NEW CONCEPTS -IWEM
3.1.1 IWEM in Action
3.2 NEW TECHNOLOGIES IN GEF HAIHE PROJECT
3.2.1 Remote Sensing for ET Management
3.2.2 Knowledge Management KM.
3.3 River Coding
3.3.1 The Stream Reach as the Fundamental Unit of a Surface Water Knowledge Base
3.3.2 Characteristics of the River Coding System
3.4 ET Management
3.4.1 Remote Sensing Estimate of ET
3.5 Development and Application of the SWAT Model and Dualistic Model
3.5.1 SWAT Model in Zhangweinan Sub-basin
3.5.2 SWAT Model of Hai River Basin
3.5.3 Development and Application of Dualistic Model
Chapter 4 STRATEGIC STUDIES FOR WATER RESOURCES AND WATER ENVIRONMENT AND THE DEMONSTRATION PROJECTS
4.1 INTRODUCTION
4.2 STRATEGIC STUDY OF INSTITUTIONAL MECHANISMS, POLICIES AND REGULATIONS
4.2.1 Overall Objective
4.2.2 Suggestions for IWEM Policies in Hai River Basin
4.2.3 Improving the Legal Framework
4.2.4 Suggestions on Institutional Reform for IWEM in Hai River Basin.
4.2.5 Implementation Plan for Reform
4.3 STRATEGIC STUDIES ON WATER RESOURCES
4.3.1 SS4: Efficient Water Use and Water Savings
4.3.2 SS5: Sustainable Utilization of Groundwater, Water rights, and Wate Withdrawal Permitting
4.3.3 SS6: Wastewater Recycling
4.3.4 SS8: Reasonable Water Allocation in Beijing After the South-North Water Transfer
4.4 STRATEGIC STUDIES ON WATER POLLUTION CONTROL
4.4.1 SS2: IWEM Strategy for the Bohai Sea
4.4.2 Strategic Study 3: Water Ecological Restoration
4.4.3 Strategic Study 7: Control of Pollution Sources
4.4.4 Rural Non-Point SourceNPS Pollution
4.5 DEMONSTRATION PROJECTS
4.5.1 Demonstration Projects of Water Resources Management
4.5.2 Water Pollution Control Demonstration Projects
Chapter 5 INTEGRATED WATER RESOURCES AND ENVIRONMENT MANAGEMENT PLANS IWEMPs
5.1 OVERVIEW OF INTEGRATED WATER RESOURCES AND ENVIRONMENT MANAGEMENT PLANNING
5.2 TIANJIN MUNICIPALITY IWEMP
5.2.1 Tianjin Municipality Overview
5.2.2 Highlights of Tianjin Municipality''s IWEM Plan
5.3 TIANJIN MUNICIPALITY IWEMP SPECIAL STUDIES
5.3.1 Special Study on Water Quality
5.3.2 Water Ecology and Rehabilitation
5.4 TYPICAL COUNTYLEVEL IWEMPLANS
5.4.1 Pinggu District of Beijing Municipality
5.4.2 Xinxiang County of Henan Province
5.4.3 Guantao County of Hebei Province
Chapter 6 STRATEGIC ACTION PLANSAPAT THE BASIN AND SUB BASIN LEVEL
6.1 GENERAL INTRODUCTION ABOUT SAP
6.2 SAP AT THE LEVEL 0F HAI RIVER BASIN
6.2.1 Basin Features
6.2.2 Socio—economic Characteristics
6.2.3 Main Problems
6.2.4 Tasks and Objectives for the SAP at Hai River Basin Level
6.2.5 Principal Recommendations ofthe Hai River Basin SAP
6.2.6 Safeguard Measures for SAP at Hai River Basin Level
6.3 SAP FOR ZHANGWEINAN SUB—BASIN
6.3.1 General Introduction ofthe Zhangweinan Sub—basin
6.3.2 Zhangweinan Sub—basin SAP
Chapter 7 SUMMARY OF PROJECT 0UTOMES AND EXPERIENCE
7.1 CONTEXT 0F THE PROJECT
7.2 MONITORING AND EVALUATION
7.3 PROJECT OBJECTIVES
7.4 MAIN OUTCOMES OF THE PROJECT
7.5 PROJECT IMPLEMENTATION EXPERIENCE
7.5.1 Cross—departmental Cooperation Mechanism
7.5.2 Key Innovations
7.6 THE GEF H_AI RIVER PRoJECT AND THE 12TH “FIVE—YEAR”PLAN